Barrow Road Railway Bridge


Scheme:                  Barrow Road Railway Bridge Sheffield

Problem:                  Long term deterioration of rail bridge masonry

Solution:                  Reconstruction

Client:                      Railway Paths Limited

Works duration:        2 weeks          

Contract value:         £16,100.00

As part of a developing relationship with Railway Paths Limited, Ram Services Limited removed trees grown into parapet walls, and took down and rebuild several areas of deteriorated masonry on the former rail bridge at Barrow Road in Sheffield.