Scheme: Barrow Road Railway Bridge Sheffield
Problem: Long term deterioration of rail bridge masonry
Solution: Reconstruction
Client: Railway Paths Limited
Works duration: 2 weeks
Contract value: £16,100.00
As part of a developing relationship with Railway Paths Limited, Ram Services Limited removed trees grown into parapet walls, and took down and rebuild several areas of deteriorated masonry on the former rail bridge at Barrow Road in Sheffield.