RAM Logo_White.png
×

PROJECTS

Case study 1_header.png

UTILITIES, POTABLE WATER

Internal Remediation Works of Critical Service Reservoir



2022

Case study 2_header.png

UTILITIES, POTABLE WATER

Service Reservoir Refurbishment Scheme



2022

Case study 3.png

UTILITIES, POTABLE WATER

External remedial works and the installation of an exhaustive internal lining system

2022

Case study 4.png

CIVIL ENGINEERING;
STADIA REMEDIAL WORKS

Remedial works to existing Premier League Stadium

2023

Case study 5.png

CIVIL ENGINEERING;
MASONRY WORKS

Extensive flood alleviation scheme

2015 - Ongoing

Case study 6.png

CIVIL ENGINEERING;
CONCRETE REPAIRS

Concrete repair package on a large bank in coastal town

2021

Case study 7.png

POWER, INFRASTRUCTURE

Diamond Drilling; Battery Power Area


2022

Case study 8.png

POWER, INFRASTRUCTURE

Concrete condition surveys and structural remedial works

Ongoing

Case study 9.png

CIVIL ENGINEERING; 
WASTE WATER

Crack injection works



2022

Case study 10.png

UTILITIES, PROTECTING
CONCRETE STRUCTURES

Protective Coating Works



Ongoing

Aqueduct_case study.png

UTILITIES, POTABLE WATER

Aqueduct – Programmed Outage Remedial Works



Ongoing

Case study 12.png

UTILITIES, POTABLE WATER

The cleaning and disinfection of service reservoirs and associated potable water structures

Ongoing

Case study 13.png

CROSS SECTOR;
MECHANICAL ENGINEERING
AND FABRICATION CAPABILITY

Mechanical Installation and Fabrication

Ongoing

Firstly, Happy New Year to you all at RAM Services Ltd. Congratulations to your team for the amazing work. It’s always great to hear key stakeholder feedback especially when it’s so positive.

LEAD PROJECT MANAGER - SEVERN TRENT WATER

Have a question or need assistance? Contact us today. Our team is here to help you with anything you need.